Who this guide is for
GMADA’s Eco City schemes at Mullanpur, New Chandigarh, have put many residential plots in private hands. If you own one, or are about to buy one, the questions are the same: what can you build, which drawings decide it, and how do the plans get approved?
This guide reflects the published documents as of 31 October 2026. It is a general overview, not legal advice and not an approval for any plot. For the step-by-step approval process, read our GMADA building approval guide.
Eco City 1, 2 and 3: what the plot sizes tell you
Plot categories describe how a scheme was laid out or allotted. They are history, not a list of plots for sale today.
- Eco City 1: GMADA publishes its layout and zoning plans. Check the category of your own plot in your allotment papers.
- Eco City 2: GMADA’s notice for the numbering draw held on 19 January 2023 covered its 289-plot scheme, in sizes of 200, 300, 400, 450, 500, 1,000 and 2,000 sq yd, for Letter of Intent holders. GMADA notice
- Eco City 3 is a residential scheme on about 713.375 acres in Rasulpur, Salamatpur, Dhode Majra, Takipur, Rajgarh, Majra, Kartarpur, Kansala and Hoshiyarpur, under a Punjab notification of 13 May 2025. Punjab notification We found no public sale launch or final plot-level building controls. It is also a land pooling scheme. A March 2026 corrigendum to the 4 March 2026 public notice revised one entitlement option: a landowner with 7 kanal of acquired land choosing Option B (residential + commercial) now gets one 500 sq yd and two 300 sq yd residential plots and one 100 sq yd commercial plot, in place of the earlier 500, 300 and 200 sq yd residential mix. That is a landowner’s entitlement, not plots on offer to buyers. GMADA corrigendum, March 2026
The zoning plan comes first
GMADA publishes separate layout and zoning plans for Eco City 1, Eco City 2 and the Eco City 2 Extension, and asks allottees to “strictly abide by these Zoning Plans”. On 31 October 2026 its list did not include an Eco City 3 zoning plan. GMADA zoning and layout plans
The zoning plan for your plot fixes the setbacks, building lines and other controls that a general rule table cannot. Two plots of the same size in the same sector can carry different conditions, for example on a corner or facing a green. Get the drawing that applies to your plot number before you agree a floor plan. Our guide to reading a GMADA zoning plan explains what to look for.
The 2021 plotted-house baseline
The Punjab Urban Planning and Development Building Rules, 2021, as notified, set out a table for residential plots and villas. 2021 Rules, Gazette (archive.org mirror)
| Parameter | 2021 table, as notified |
|---|---|
| Maximum floors | Ground + 2 (excluding basement) |
| Maximum height | 11 m from the plinth level |
| Maximum FAR | 2.1 × plot area, in every size band from 60 sq m to above 450 sq m |
| Plinth | 900 mm from the crown of the road in front |
| Setbacks | As per the Uniform Zoning Plan drawing of July 2020, read with the plot’s zoning plan |
Treat these as a baseline only. The rules have been amended since, ground coverage varies with plot size, and your plot’s zoning plan and allotment conditions can be stricter. None of these figures is an approval for your plot.
Self-certification: three sources, three answers
Who can approve a house plan, and how long you wait, depends on which text you read. As of 31 October 2026:
| Source | Who qualifies | Notice before construction |
|---|---|---|
| 2021 Rules, rule 12, as notified in 2021 | Residential plots up to 1,000 sq yd (836 sq m) | 30 days |
| GMADA’s “Get building plans approved” page (last updated 30 October 2026) | Residential plots up to 500 sq yd, through architects empanelled by GMADA | Plans submitted one week before construction starts |
| Rule 12 as substituted on 14 July 2026 (Gazette of 15 July 2026) | Buildings up to 21 m high within approved layout plans, irrespective of plot area | Seven days’ advance notice |
The July 2026 amendment replaced the original rule 12, so the 1,000 sq yd and 30-day figures are no longer the current text. GMADA’s own page still shows different figures. Before you choose a route, ask GMADA in writing which provision it applies to your plot. GMADA page · July 2026 amendment
Under any route, construction should not start until the notice period has passed without objection, and the plans must still follow the rules and the zoning plan. The rules also let the competent authority check plans and construction, and violations have to be put right at the owner’s cost.
Fees to confirm
Published fee references do not line up exactly, so confirm the demand for your file:
- GMADA’s citizen charter shows a non-refundable fee of ₹2.50 per sq ft of total covered area for fresh residential plans, with half that rate for revised plans. It lists 30 working days for plots below 500 sq yd and 60 working days above 500 sq yd for sanction of building plans. GMADA citizen charter
- The 2021 Rules, for plans submitted without self-certification, list a scrutiny fee of ₹30 per sq m of total covered area for residential buildings (about ₹2.79 per sq ft), again half for revised plans.
- GMADA’s approval page asks for a security and scrutiny fee by demand draft payable to the Estate Officer, GMADA, but states no amount.
Private townships in New Chandigarh
Not every New Chandigarh plot is a GMADA plot. Private townships, such as Omaxe’s, have their own approved layouts, and layouts have been revised over the years. If your plot is in a private township, get the current approved layout, the plot-specific zoning or control sheet, the allotment or sale conditions and the name of the authority that approves building plans there. An old brochure is not enough.
Five mistakes to avoid
Designing from the plot size alone. The zoning plan for your plot number sets the limits.
Using the 2021 table as a promise. It is a baseline; amendments and your zoning plan come first.
Trusting one self-certification figure. The 2021 text, GMADA’s page and the July 2026 amendment differ. Get GMADA’s answer in writing.
Treating a land-pooling entitlement as a buyable plot. Eco City 3 option letters are a landowner’s entitlement, not open sale.
Mixing up townships. A private township plot may follow different papers and a different approval route.
What to prepare before you meet an architect
- Plot papers: allotment letter or sale deed, plot number, scheme (Eco City 1, 2, 2 Extension, 3 or a private township) and size.
- Drawings: the zoning plan or control sheet for the plot, if you have it.
- Site facts: road width in front, corner or park-facing position, and photos.
- Your brief: bedrooms, floors, basement or stilt parking, lift, and whether you plan separate floors for family members.
- Open questions: anything GMADA or the developer has told you about the approval route or fees.
Discuss your Eco City plot with the studio
Ajooni Jasleen Architects designs homes in Mohali, New Chandigarh and the periphery, and handles clients’ GMADA approvals. Tell the studio about your plot, the records you have and the home you want, and it can discuss the design and the assistance your project needs.
For the full approval process, read our GMADA building approval guide and our GMADA zoning plan guide. Planning a farmhouse on Punjab land nearby? Read our periphery farmhouse guide.